Case Studies
Survey 3Di Ltd provision of survey services targets the energy industry with an aim to mitigate risk of project over-runs in schedule and cost by implementing innovative survey techniques, resulting in enhanced safety, improved working practices and assurance of “first time fit” at site.
The past experience provides a short insight into the Projects and differing workscopes both directors have been involved in over the years.
Case Study 1
Utilising Laser Scanning
Major rejuvenation project scheduled for major gas processing plant in the UK.
Case Study 2
Utilising Dimensional Control
Existing riser pipework identified for replacement during imminent planned shutdown.
Case Study 3
Utilising Dimensional Control
Existing Production and Test Manifolds are to be replaced with new as part of a planned offshore Shutdown.
Case Study 4
Utilising Dimensional Control
Artificial Man made Islands are to be constructed to accommodate Oil production and processing facilities capable of generating 750,000 bopd